[1] This petition has been filed by Power Grid Corporation of India Limited seeking directions to (a) National Load Despatch Centre (NLDC) or Regional Load Despatch Centres (RLDC) not to grant open access for sale of electricity from entities and associates of such entities who h...
[1] The petition has been filed by PGCIL for determination of transmission tariff for 315 MVA, 400/220kV ICT II at Misa Sub-station along with associated bays under North East/Northern Western Interconnector-I and Transmission system of Kameng HEP in NER (hereinafter referred to ...
[1] This petition has been filed for determination of transmission tariff for 400 kV S/C Singrauli -Vindhyachal Transmission Line along with (2X250 MW) HVDC back to back at Vindhyachal between Northern Region and Western Region(hereinafter referred to as "transmission asset") fro...
[1] The instant petition has been filed by Power Grid Corporation of India Limited (PGCIL) seeking grant of regulatory approval for execution of Associated Transmission System of Krishnapatnam Part B (for achieving synchronous interconnection of SR with NEW grid) and Associated T...
[1] The petitioner has filed this petition for fixation of tariff in respect of Kopili Hydro Electric Project, Stage-II (25 MW) (hereinafter referred to as "the generating station") of North Eastern Electric Power Corporation Ltd, for the period from 1.4.2009 to 31.3.2014 in acco...
[1] This petition has been filed by the petitioner, NTPC for approval of tariff for Sipat Super Thermal Power Station, Stage-II (2 x 500 MW) (hereinafter referred to as "the generating station") for the period from 1.4.2009 to 31.3.2014, based on the Central Electricity Regulator...
[1] This petition has been filed by PGCIL seeking approval for transmission tariff from date of commercial operation to 31.3.2014 for 400 kV D/C Gorakhpur - Lucknow transmission line along with associated bays (anticipated date of commercial operation 1.10.2010) under transmissio...
[1] The petitioner, NTPC had filed this application for approval of revised fixed charges for the period 2004-09, after considering the impact of additional capital expenditure incurred during 2006-07, 2007-08 and 2008-09 for Simhadri Thermal Power Station (1000 MW), (hereinafter...
[1] This petition was filed by NTPC Ltd, the petitioner herein, for approval of revised fixed charges for the period 2004-09, after considering the impact of additional capital expenditure incurred during 2007-08 and 2008-09 for Vindhyachal STPS, Stage-I (1260 MW), (hereinafter r...
[1] This petition has been filed by the petitioner, NHDC Ltd, for approval of generation tariff for Omkareshwar Hydroelectric Project (8 x 65 MW) (hereinafter referred to as "the generating station") for the period from 20.8.2007 to 31.3.2009, based on the Central Electricity Reg...